The programme tally: escrow, connections paid and held, and the release rule
This programme's demo window ends at month 4. Open a fresh programme to run it again.
- Press Run month 4 release.
- Watch 47 release and 3 hold.
- Open the receipt on the explorer.
- Press Re-sum.
- Open a held connection and lift the hold.
50 synthetic connections across 3 fictional sites, in a demo window modelled on the NEP and DARES rules. Green with a check is paid; hatched H is held by the screen for the verifier; grey met the rule this month and waits for the release.
Connections are released once meters have been active for active for 30 days or more and consumption has met 2.0 kWh or more (chosen: the terms name this threshold without a value), after the 14-day sampling window (30 s on this demo) sampling window closes without a hold. From the DARES verification terms.
Rule and keys